EIA Land Servicing Development

Project Highlights:
• 328,600 m3 of earth moving
• 823 LM of concrete storm sewer (450mm – 1200mm)
• 1255 LM of PVC watermain
• 600 LM of Sanitary
• 2285 LM of curb & gutter
• 1950 LM of Subdrain
• 21,800 TE of granular road base
• 6000 TE of asphalt
• 2258 LM of sanitary forcemain PVC (16″)
• 425 LM directional drill under highway 2 with 16″ HDPE pipe
• Electrical and Lighting Installations