EIA Expansion

Project Highlights:

  • Construction of the 210,000m2 of Concrete Apron and Laydown Area
  • Placement of 330,000te of Granulars
  • Placement of 51,000m3 of Cement Stabilized Base
  • Placement of 110,000m3 of Portland Cement Concrete Pavement
  • 4065m Subgrade Drainage 200mm Ø, Perforated PVC pipe
  • 1300m of Sewer Installation
  • 9449te of Asphalt Placement
  • Electrical Installations